Installation & Assembly of “GE” Coupling
1. Ring, housing and bolts, ready for assembly -a spanner is the only tool needed. | 2. Thoroughly lubricate Inside and outside of rubber ring with Vegetable based lubricant. This avoids pinching or nipping of the ring. Recommend use of ‘NMC’ Lubricant. | ||
3. Slip the ring over one pipe and bring both the pipe ends together. | 4. Slide the ring into central position over the pipe ends. | ||
5. Put on the sections of the housing and insert the bolts and nuts. | 6. Bolt up evenly until the nuts are fully tightened. Ensure that the bolt sections of the half housings meet, metal to metal. |