English French German Hindi Italian Portuguese Russian Spanish
English French German Hindi Italian Portuguese Russian Spanish
  • Safety Hook

    'NMC' Safety Hook operation and detaches the Cage or skips from the winding rope in the event of an over wind.

    Read more

  • Clivy Hook

    ROPE SUSPENSION EQUIPMENT ‘NMC’ Equipment for the suspension fo Sinking Gear conforms to D.G.M.S.

    Read more

  • 2 Point Tell-Tale

    2 Point Tell-Tale for dry hole pic & two line matter

  • Auto Warning Tell-Tale

    Model-AWTT-O1 INTRODUCTION AWTTis primarily used in depillaring area.

    Read more

  • Bore Hole Micrometer

     

  • Dismantling Joint

    NMC Dismantling Joint is a double flanged fitting that allows longitudinal adjustments in flanged pipe systems.

    Read more

  • Mechanical Coupling

     

  • Pipe Repair Clamp

     

Installation & Assembly of "GE" Coupling

  1. Ring, housing and  bolts, ready for assembly  -a spanner is  the only tool  needed.     2. Thoroughly lubricate Inside and outside of rubber ring with Vegetable based lubricant. This avoids pinching or nipping of the ring. Recommend use of ‘NMC’ Lubricant.
             
  3. Slip the ring over one pipe and bring both the pipe ends together.     4. Slide the ring into central position over the pipe ends.
             
  5. Put on the sections of the housing and insert the bolts and nuts.     6. Bolt up evenly until the nuts are fully tightened.
Ensure that the bolt sections of the half housings meet, metal to metal.

 

QUANTITY OF LUBRICANT FOR RUBBER GASKETS

SL.No.   Size of G.E. Coupling Gasket   No. of gaskets that can be lubricated
per kg of lubricant (approx)
1.   48.3   570
2.   60.3   430
3.   88.9   290
4.   114.3   215
5.   168.3   135
6.   219.1   110
7.   273.0   85
8.   323.0   65
9.   355.6   55
10.   406.4   50
11.   457.0   40
12.   508.0   30
13.   610.0   20

Login

Background Image